EQ

EARTHQUAKE VALVE CPC 1211.7 & A.M.C.13-6.2(C)

  • A valid permit and plans must be on-site R106.3.1
  • Approved valve (check cut sheet list)
  • Installed on the house side of the test-tee PG&E
  • Test-tee plug must be accessible PG&E
  • Installed per mfg instructions
    • Little Firefighter: must be within 2 degrees of plumb
  • Valve reset must be accessible
  • ***Check the direction of flow***
  • Soap test CPC 1213.4.1

Little Firefighter BTU ratings:

3/4” horizontal 692,000 Btu

3/4” vertical 600,000 Btu