Footings/Slab/CMU

  • A valid permit and plans must be on-site R106.3.1
  • Verify that ground plumbing has been signed off R1.8.4.4

General

  • Special inspections
  • Engineer’s observation
  • Location and setbacks
  • Check for survey markers
  • Verify elevation (FEMA)
  • Fire-rated construction: ≤ 5’ from the property line TABLE R302.1.1
  • Rebar grade: R404.1.3.3.7.1 – lap splices R404.1.3.3.7.5 TABLE R608.5.4.3 – 40 diameters
  • Rebar bend: ≤ 6 bar diameters FIGURE R608.5.4.3
  • Piers, grade beams: size, placement, steel
  • Water/damp-proof foundation wall CRC R406 

Rebar Clearances R403.1.3.5.3 and Table 20.6.1.3.1

3” _____Earth (without form boards)

1.5” ____Forms ≤ #5 

2” _____Forms ≥ #6                                                                         

3/4” ___Air

Footings 

  • Width, depth, and length 
  • Trenches clean R403.1
  • Rebar: size, laps, ties 40 diameters. Per plans
  • Some require waterproofing or vapor mitigation

Anchor Bolts & Seismic     

  • 6’ oc 1 story (see shear schedule on plans)
  • 4’ oc 2 story (see shear schedule on plans)
  • 7” embedment R403.1.6
  • Check orientation
  • Hold-downs: size, location
  • ≤ 12” or ≥4” to plate end R403.1.6 

Plumbing

  • Gas pipe: size – lengths – NOT UNDER SLAB except to island in vented pipe/chase CPC 1210.1.6
  • Plumbing wrapped (vertical) CPC 312.2
  • Plumbing sleeved (horizontal) CPC 312.10 
  • No plumbing shall be directly embedded in concrete or masonry CPC 312.2

Electrical

  • UFER: #4 copper or #4 rebar – 20’ CEC 250.52.A.3
  • Electrical underground: conduit, wire size

Sills 

Venting & Access

  • Crawl space vent: 1/150⎅ R408.1
  • Class 1 vapor barrier 1/1,500⎅ R408.1
  • Access: 18 x 24” through floor – 16 x 24” perimeter wall R408.4

Slab

Area Wells R310.2.3

  • Min window size 5⎅
  • Min 9⎅ Min 3’ projection
  • > 44” deep requires a ladder
  • Ladder min 3” max 6” projecting off well wall, rungs at ≤ 18” oc vertically
  • Requires drainage tied into foundation drain to comply with CRC R405.1

CMU Walls CBC 2104A.1.3

  • Cleanout openings: In hollow unit masonry shall be provided in every cell at the bottom of each pour of grout. Cleanouts in multi-wythe masonry shall be provided for each pour by leaving out every other unit in the bottom wythe of the section being poured or by cleanout openings in the foundation.
  • Height CBC 2104A.1.3.5: For grout pours not greater than 4 feet (1219 mm) or 5 feet 4 inches (1651 mm) for 10-inch (254 mm) nominal or wider hollow unit masonry, the top of grout pour shall be at the top of constructed masonry, or within 8 inches (200 mm) of the top of the constructed masonry.