Sheetrock

SHEETROCK R702.3

  • Check gas gauge before and after inspection (≥ 15 min) CPC 1213.3
  • Over shear verify 5/8″ penetration into structure
  • 1″ clearance to combustibles at B-vents
  • HVAC registers nailed on 4 sides
  • Exhaust fans nailed on 2 sides
  • Look for covered outlets and registers
  • ≥ 1/2″ rock on underside of stairs R302.7

Nailing/Screw Schedule CRC R702.3.5 and CRC R702.3.6

Thickness ___Direction___Framing___Nail___Screw

1/2” _________Vert ________16 oc ____8” ____16”

1/2” _________Horiz _______16 oc _____7” ____12”

1/2” _________Vert ________24 oc _____7”____12”

1/2” _________Horiz _______24 oc _____8” ____12”

5/8” _________Vert ________16 oc _____8” ____16”

5/8” _________Horiz _______16 oc _____7”____ 12”

5/8” _________Vert ________24 oc _____7”____12”

5/8” _________Horiz _______24 oc _____8”____12”

Fire Rated Gypsum Board

  • > 4” recessed can at party wall = 5 sided 5/8” s/r box
  • Ventilation fan with party wall = 5 sided 5/8” s/r shaft or 5 sided box at fan with 26ga fan ducting
  • ≥ 5/8” type X at party walls (check plans)
  • Firewall nails at 7″ and screws at 12″
  • 5/8″ type X on garage lid if living space above

Greenboard (not to be used in the following):

  • Over vapor retarder
  • Areas subject to continuous high humidity
  • Ceilings with framing > 12” oc for 1/2” – 16” oc for 5/8”
  • Showers/tub enclosures